Pipelines

CONSTRUCTION – INSTALLATION – MAINTENANCE

  • CSA-Z662 Pipeline Construction (Up to 12”)
  • Small Bore pipeline installation ranging from 2” to 12”
  • Carbon steel
  • Flex Steel
  • Fibre Spar
  • Polyurethanes
  • Duplex
  • Integrity Inspections
  • ILI support
  • Pipeline Abandonment
  • Pipeline maintenance
  • Emac Inspections
Komatsu Front Load Bucket